SR 112 over BAY POLE CREEK OVERFLOW

APP 9.5 MI S OF CAMILLA · County 205, Georgia · Built 1969 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020500340
Year Built
1969
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
2,300
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.