OLD HIGHWAY 19 over BIG SLOUGH TRIB

APP 3 MI N OF PELHAM · County 205, Georgia · Built 1919 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000020500010
Year Built
1919
Reconstructed
1934
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.