GRADY COBB ROAD over DRY CREEK

APP 2 MI N OF JCT SR 91 · County 201, Georgia · Built 1955 · 2 Lanes · 640 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000020100160
Year Built
1955
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
640
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.