CO LINE CHURCH RD. over WHITE SULPHUR CREEK

1.5 MI S OF DURAND · County 199, Georgia · Built 2019 · 2 Lanes · 140 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000019951180
Year Built
2019
Length
39.6 m (129.9 ft)
Max Span
15.2 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
140
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$11,544,000
Total Project Cost
$17,316,000