SR 85 ALT over COLD SPRINGS BRANCH

3 MI N OF WARM SPRINGS · County 199, Georgia · Built 1967 · 2 Lanes · 1,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019900380
Year Built
1967
Length
32.9 m (107.9 ft)
Max Span
11 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,900
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$422,000
Total Project Cost
$633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.