SR 172 over BROAD RIVER

7 MI NE OF COMER · County 195, Georgia · Built 1953 · 2 Lanes · 2,970 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019500180
Year Built
1953
Length
110.6 m (362.9 ft)
Max Span
30.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,970
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$417,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.