SR 106 over HUDSON RIVER

3.8 MI N OF POCATALICO · County 195, Georgia · Built 1954 · 2 Lanes · 3,250 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000019500160
Year Built
1954
Length
67.1 m (220.1 ft)
Max Span
18.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
3,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$190,000
Total Project Cost
$338,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.