SOUTH DOOLY ST over BEAVER CREEK

CENTRAL MONTEZUMA · County 193, Georgia · Built 1952 · 2 Lanes · 2,140 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019350420
Year Built
1952
Length
46.6 m (152.9 ft)
Max Span
18 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
2,140
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$598,000
Total Project Cost
$897,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.