THREE POINTS RD over I-20

4.1 MI NW OF THOMSON · County 189, Georgia · Built 2012 · 2 Lanes · 240 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018950270
Year Built
2012
Length
81.1 m (266.1 ft)
Max Span
26.8 m
Width
18.7 m (61.4 ft)
Lanes
2
Daily Traffic
240
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,039,000
Total Project Cost
$1,559,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.