MT OLIVE ROAD over SANDY CREEK
13.2 MI NW OF DUBLIN · County 175, Georgia · Built 2017 · 2 Lanes · 200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
32.647361, -83.091622
This bridge is in worse condition than 39.6% of bridges in County 175. The average bridge in Georgia is 0 years old; this one is 9 years old.
Nearby Bridges
US 441/SR 29 over SOUTH SANDY CREEK
Built 1986
QUINN WILLIAMS RD over CEDAR CREEK
Built 1996
US 441 (SBL) / SR over CEDAR CREEK
Built 2003
US 441 (NBL) / SR over CEDAR CREEK
Built 1959
US 441 (NBL) / SR over CEDAR CREEK OVERFLOW
Built 1959
US 441 (SBL) / SR over CEDAR CREEK OVERFLOW
Built 2005
OLD MONTROSE ROAD over TURKEY CREEK OVERFLOW
Built 1985
CHAPPELL MILL ROAD over TURKEY CREEK
Built 2017
OLD MONTROSE ROAD over TURKEY CREEK
Built 1985
CR 191 over SOUTH SANDY CREEK
Built 1965
Bridge Details
- Structure #
- 000000017551140
- Year Built
- 2017
- Length
- 30.5 m (100.1 ft)
- Max Span
- 14.6 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,880,000
- Total Project Cost
- $31,320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.