WEST LAKE DRIVE over BIG BRANCH

8 MI NE OF DUBLIN · County 175, Georgia · Built 1970 · 2 Lanes · 430 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000017550760
Year Built
1970
Length
12.2 m (40 ft)
Max Span
6.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
430
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$41,000
Total Project Cost
$172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.