I-16 (WBL) over OCONEE RIVER OVERFLOW

4.3 MI SE OF DUBLIN · County 175, Georgia · Built 1963 · 2 Lanes · 25,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000017500760
Year Built
1963
Reconstructed
2000
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
25,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$241,000
Total Project Cost
$420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.