US 341 (SBL) over NS RAILROAD

IN BARNESVILLE · County 171, Georgia · Built 1964 · 2 Lanes · 9,170 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017100020
Year Built
1964
Length
50.6 m (166 ft)
Max Span
17.1 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
9,170
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.