CANOOCHEE-HERNDON over OGEECHEE RIVER OVERFLOW

11 MI W OF MILLEN · County 165, Georgia · Built 2016 · 2 Lanes · 260 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000016550390
Year Built
2016
Length
68.6 m (225.1 ft)
Max Span
13.7 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
260
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$19,980,000
Total Project Cost
$29,970,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.