US 25 SR 121 (NBL over SPRING MILL CREEK

5 MILES N. OF MILLEN · County 165, Georgia · Built 2007 · 2 Lanes · 7,590 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000016550360
Year Built
2007
Length
71.9 m (235.9 ft)
Max Span
29.9 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
7,590
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.