US 25 SR 23 over OGEECHEE RIVER OVERFLOW

2 MI SW OF MILLEN · County 165, Georgia · Built 2003 · 5 Lanes · 9,240 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000016550280
Year Built
2003
Length
408.4 m (1339.9 ft)
Max Span
39.6 m
Width
27.9 m (91.5 ft)
Lanes
5
Daily Traffic
9,240
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,519,000
Total Project Cost
$14,279,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.