US 1 (SBL) SR 4 over BRIER CREEK

7 MI NE OF WRENS · County 163, Georgia · Built 2001 · 2 Lanes · 6,980 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000016350540
Year Built
2001
Length
219.5 m (720.1 ft)
Max Span
24.4 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
6,980
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,813,000
Total Project Cost
$4,220,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.