CR 253 over BOYD BRANCH

3 MI SW OF LOUISVILLE · County 163, Georgia · Built 1971 · 2 Lanes · 500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000016350360
Year Built
1971
Length
9.1 m (29.9 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.