SR 78 over OGEECHEE RIVER

5 MI E OF WADLEY · County 163, Georgia · Built 1993 · 2 Lanes · 780 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000016300480
Year Built
1993
Length
381 m (1250 ft)
Max Span
21.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
780
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,884,000
Total Project Cost
$7,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.