US 23 over NORFOLK SOUTHERN R/R

0.6 MI SE OF HAZLEHURST · County 161, Georgia · Built 2020 · 2 Lanes · 520 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000016150250
Year Built
2020
Length
53.3 m (174.9 ft)
Max Span
25.9 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
520
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,540,000
Total Project Cost
$23,310,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.