SHEPARD RAY ROAD over BULLARD CREEK

9.5 MI NE OF HAZLEHURST · County 161, Georgia · Built 1980 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000016150040
Year Built
1980
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
158
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.