FULLERTON-PHILLIP over CEDAR CREEK

8.9 MI SE OF MONTICELLO · County 159, Georgia · Built 1968 · 2 Lanes · 170 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015950360
Year Built
1968
Length
42.7 m (140.1 ft)
Max Span
8.5 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
170
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$547,000
Total Project Cost
$821,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.