I-85 (SR 403) over CR 296 RIDGEWAY CH ROAD

3.3 MI N OF COMMERCE · County 157, Georgia · Built 2024 · 6 Lanes · 50,700 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000015751190
Year Built
2024
Length
28.3 m (92.8 ft)
Max Span
28.3 m
Width
38.1 m (125 ft)
Lanes
6
Daily Traffic
50,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,288,000
Total Project Cost
$12,432,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.