I-85 (SR 403) over NORTH OCONEE RIVER

4.4 MI NW OF COMMERCE · County 157, Georgia · Built 2024 · 6 Lanes · 54,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000015751180
Year Built
2024
Length
99.1 m (325.1 ft)
Max Span
36.7 m
Width
38.1 m (125 ft)
Lanes
6
Daily Traffic
54,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$28,860,000
Total Project Cost
$43,290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.