I-85 N/B AND S/B over CSX RAILROAD

1.8M SE OF PENDERGRASS · County 157, Georgia · Built 2022 · 6 Lanes · 61,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000015751130
Year Built
2022
Length
65.2 m (213.9 ft)
Max Span
32.3 m
Width
38.4 m (126 ft)
Lanes
6
Daily Traffic
61,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,018,000
Total Project Cost
$28,527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.