US 41- SR 49 over ECHEECONNEE CREEK

5 MI NNW OF WARNER ROBINS · County 153, Georgia · Built 1995 · 2 Lanes · 7,720 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000015300930
Year Built
1995
Length
176.8 m (580.1 ft)
Max Span
12.2 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
7,720
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,266,000
Total Project Cost
$3,399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.