BLACKHALL ROAD over RUM CREEK

3 MI SW OF STOCKBRIDGE · County 151, Georgia · Built 2019 · 2 Lanes · 8,650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015151270
Year Built
2019
Length
59.4 m (194.9 ft)
Max Span
28.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
8,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$17,316,000
Total Project Cost
$25,974,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.