CR 824 JODECO ROAD over I-75

5 MI NW OF MCDONOUGH · County 151, Georgia · Built 2014 · 8 Lanes · 26,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000015151180
Year Built
2014
Length
118.5 m (388.8 ft)
Max Span
37.5 m
Width
37 m (121.4 ft)
Lanes
8
Daily Traffic
26,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$34,517,000
Total Project Cost
$51,776,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.