SR 20 WBL over US 19

1 MI W OF HAMPTON · County 151, Georgia · Built 2004 · 2 Lanes · 18,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000015150710
Year Built
2004
Length
88.4 m (290 ft)
Max Span
31.4 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
18,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,133,000
Total Project Cost
$1,700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.