I-75 over SR 138

2 MI W OF STOCKBRIDGE · County 151, Georgia · Built 1969 · 7 Lanes · 132,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015100460
Year Built
1969
Reconstructed
1990
Length
49.4 m (162.1 ft)
Max Span
24.4 m
Width
40.8 m (133.9 ft)
Lanes
7
Daily Traffic
132,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,496,000
Total Project Cost
$2,244,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.