I-75 over SR 155- NRFLK STHRN RR

3 MI S OF MCDONOUGH · County 151, Georgia · Built 1967 · 8 Lanes · 119,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015100330
Year Built
1967
Reconstructed
2001
Length
73.2 m (240.2 ft)
Max Span
21.3 m
Width
46.8 m (153.5 ft)
Lanes
8
Daily Traffic
119,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,472,000
Total Project Cost
$3,708,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.