SR 1/ US 27 NBL over SR 34/CHATTAHOCHEE RIVER

0.9 MI NE OF FRANKLIN · County 149, Georgia · Built 2006 · 2 Lanes · 5,810 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000014950510
Year Built
2006
Length
430.1 m (1411.1 ft)
Max Span
39 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
5,810
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,513,000
Total Project Cost
$8,270,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.