SR 181 over SAVANNAH RIVER

@ SOUTH CAROLINA ST LINE · County 147, Georgia · Built 1983 · 2 Lanes · 1,280 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000014700170
Year Built
1983
Length
204.8 m (671.9 ft)
Max Span
25.6 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
1,280
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,626,000
Total Project Cost
$3,938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.