US 27 (SBL)/ SR1 over TALLAPOOSA RIVER

4.4 MI NW OF BUCHANAN · County 143, Georgia · Built 2001 · 2 Lanes · 3,180 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000014350840
Year Built
2001
Length
103.6 m (339.9 ft)
Max Span
30.5 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
3,180
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,328,000
Total Project Cost
$1,993,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.