SR 1BUS- US 27BUS over NS RAILROAD (719256U)

BUCHANAN - NORTHSIDE · County 143, Georgia · Built 1999 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000014350830
Year Built
1999
Length
59.1 m (193.9 ft)
Max Span
21 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
1,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$758,000
Total Project Cost
$1,137,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.