I-20 (WBL) over WALKER CREEK TRIB.

3 MI SW OF WACO · County 143, Georgia · Built 1976 · 2 Lanes · 77,600 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000014300210
Year Built
1976
Length
8.5 m (27.9 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
77,600
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$109,000
Total Project Cost
$164,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.