SR 100 over TALLAPOOSA RIVER

2.5 MI N OF TALLAPOOSA · County 143, Georgia · Built 1952 · 2 Lanes · 4,960 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
000000014300080
Year Built
1952
Reconstructed
1989
Length
88.1 m (289 ft)
Max Span
18.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
4,960
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,129,000
Total Project Cost
$1,694,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.