SR 16 over LITTLE OGEECHEE RIVER

3.4 MI E OF SPARTA · County 141, Georgia · Built 2014 · 2 Lanes · 1,570 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000014150590
Year Built
2014
Length
41.1 m (134.8 ft)
Max Span
13.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,570
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$519,080,000
Total Project Cost
$778,620,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.