HALL CHAPEL ROAD over CSX RAILROAD (279810R)

6.8 MI SW OF SPARTA · County 141, Georgia · Built 1992 · 2 Lanes · 110 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000014150270
Year Built
1992
Length
28.7 m (94.2 ft)
Max Span
7.9 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
110
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$367,000
Total Project Cost
$551,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.