US 129 over EAST FORK LITTLE RIVER

5 MI N OF GAINESVILLE · County 139, Georgia · Built 2020 · 2 Lanes · 15,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013951150
Year Built
2020
Length
201.5 m (661.1 ft)
Max Span
40.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
15,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$58,682,000
Total Project Cost
$88,023,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.