PEA RIDGE ROAD over MUD CREEK

4 MI N OF LULA · County 139, Georgia · Built 1965 · 2 Lanes · 420 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000013950570
Year Built
1965
Length
74.7 m (245.1 ft)
Max Span
19.8 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
420
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$957,000
Total Project Cost
$1,436,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.