SUGAR LOAF PWY over CSX RAILROAD

3 MI W OF LAWRENCEVILLE · County 135, Georgia · Built 1994 · 4 Lanes · 43,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013551410
Year Built
1994
Length
125.3 m (411.1 ft)
Max Span
36.3 m
Width
29.1 m (95.5 ft)
Lanes
4
Daily Traffic
43,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,482,000
Total Project Cost
$3,723,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.