RAMP TO SR 8 NBL over SWEETWATER CREEK

1.5 MI N OF LILBURN · County 135, Georgia · Built 1995 · 1 Lanes · 6,850 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013501290
Year Built
1995
Length
80.5 m (264.1 ft)
Max Span
26.8 m
Width
10.7 m (35.1 ft)
Lanes
1
Daily Traffic
6,850
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$750,000
Total Project Cost
$1,125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.