CENTER WAY over I-85

1.8 MI S OF NORCROSS · County 135, Georgia · Built 1987 · 4 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013501040
Year Built
1987
Length
62.8 m (206 ft)
Max Span
31.4 m
Width
20.3 m (66.6 ft)
Lanes
4
Daily Traffic
2,047
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,244,000
Total Project Cost
$1,866,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.