I-985 (SBL) over IVY CREEK

2.3 MI E OF SUWANEE · County 135, Georgia · Built 1965 · 2 Lanes · 74,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013500470
Year Built
1965
Length
63.7 m (209 ft)
Max Span
22.6 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
74,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$817,000
Total Project Cost
$1,225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.