SR 8 - US 29 over ALCOVY RIVER

3 MI NE OF LAWRENCEVILLE · County 135, Georgia · Built 1929 · 2 Lanes · 10,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000013500060
Year Built
1929
Reconstructed
1957
Length
35.1 m (115.2 ft)
Max Span
11.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
10,200
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$449,000
Total Project Cost
$674,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.