SR 44 over NORTH FORK LITTLE RIVER

7.8 MI NE OF UNION POINT · County 133, Georgia · Built 2004 · 2 Lanes · 840 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013350540
Year Built
2004
Length
73.2 m (240.2 ft)
Max Span
30.5 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
840
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.