SR 44 over I-20

2.5 MI S OF GREENESBORO · County 133, Georgia · Built 2003 · 3 Lanes · 13,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013350520
Year Built
2003
Length
81.1 m (266.1 ft)
Max Span
40.5 m
Width
21.5 m (70.5 ft)
Lanes
3
Daily Traffic
13,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,323,000
Total Project Cost
$1,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.