SR 15 over OCONEE RIVER

11.9 MI NW OF GREENSBORO · County 133, Georgia · Built 1990 · 2 Lanes · 4,270 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013300400
Year Built
1990
Length
182.9 m (600.1 ft)
Max Span
22.9 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
4,270
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,344,000
Total Project Cost
$3,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.