PINE BARK ROAD over LITTLE TIRED CREEK

2.5 MI SE OF CAIRO · County 131, Georgia · Built 2004 · 2 Lanes · 890 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013150990
Year Built
2004
Length
91.4 m (299.9 ft)
Max Span
18.3 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
890
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,172,000
Total Project Cost
$1,758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.